PIAL's SEHDPE do not require any welding on site. They are fast and easy to install and only require semi-skilled labour for installation.

GET IN TOUCH

PIAL's SEHDPE do not require any welding on site. They are fast and easy to install and only require semi-skilled labour for installation.

GET IN TOUCH
  • Applications
  • Key Features
  • Technical Specifications
  • Potable water supply
  • Gas distribution
  • Irrigation
  • Mining
  • Industrial
  • No welding required on site
  • Fast and easy to install
  • Simple tools
  • Semi-skilled labour to install
  • Leak-free under pressure and vacuum
  • Corrosion proof
Pressure Ratings SEHDPE™ System Maximum Operating Pressure
IS 4984:1995 Pressure Rating Working Pressure Pressure 90 to 180mm dia 90 to 180 dia 75mm dia only
    bar Mpa bar Mpa bar Mpa
  PN2.5 2.5 0.25 5.7 0.57 5.7 0.57
  PN 4.0 4.0 0.40 8.5 0.85 8.5 0.85
  PN 6.0 6.0 0.60 13.4 1.34 8.5 0.85
  PN10.0 10.0 1.00 17.0 1.70    
IS 14151(Part 1):1994 Class            
  1 2.5 0.25 4.9 0.49 4.9 0.49
  2 3.2 0.32 6.1 0.61 6.1 0.61
  3 4.0 0.40 7.5 0.75 7.5 0.75
  4 6.0 0.60 11.3 1.13 8.5 0.85